Who will be in my house each day?
Ask for names and roles: who leads the job, who installs, who comes for plumbing and electrical. You should know who to expect before the first morning.
What exactly is in the written quote?
It should list the cabinets, counters, fixtures, flooring and lighting by line, and say what is an allowance rather than a fixed price. Vague lines such as miscellaneous or finish work are worth asking about.
What happens if you find something behind the wall?
Old wiring, rot or a pipe in the wrong place can change the scope. Ask how it is documented, who approves the change, and whether you see the added cost in writing before work continues.
Which permits does my plan need?
Moving walls, gas or electrical usually needs a permit with the city. A remodeler should tell you which parts of your plan do, and how inspections fit the schedule.
How long will I be without a kitchen?
Ask for the stretch with no working sink or stove, not only the total job length. A temporary setup with a sink, a fridge and a microwave makes that stretch far easier to live with.
How will you protect the rest of the house?
Look for floor protection, sealed doorways, dust control and a daily clean-up. Ask what the crew does at the end of each day, not only at the end of the job.
How are changes handled?
You will probably change your mind about something. A written change order with the cost and the schedule effect keeps both sides clear on what was agreed.