Loading this page…

New layout, cabinets, counters, lighting and floors planned together, so the room is finished once instead of in five pieces.
Most San Jose kitchens are tight, so the useful work happens inside the walls you already have: a better work triangle, cabinets that reach the ceiling, and light where you chop and stir.
We measure, talk through how you cook, and draw the room before anything is ordered. If a wall, a gas line or the panel has to move, you hear it at the start, along with what it means for permits and the schedule.

Measured drawings, cabinet elevations and a materials list you can read without a glossary.
Floors, doorways and the rest of the house are covered before anything comes out.
Ordered and installed in the right sequence, so no trade waits on a missing piece.
Rough-in work is done first, then the lighting and fixtures follow the plan you approved.
We look at the room, measure it, and listen to how you use it.
Layout, finishes and the written quote are agreed before work starts.
Demolition, rough work, cabinets, counters, then the finish details.
We go through the finished kitchen with you and write down anything left.
Usually yes. Moving plumbing or gas changes the permit and the schedule, and the written quote says so.
For part of it. We plan a temporary sink and fridge area, and the order of work keeps the gap as short as it can be.
Jobs that move walls, gas or electrical need a city permit. We list which parts of your plan do at the estimate, so the schedule already includes them.
Tell us what you want to change and the town you are in. We come out, measure, and put the price in writing.
Calls answered 24/7